Wycombe Poolview Installation Progressing

On site at the new 50metre swimming pool in Wycombe. We are installing the below water cameras before the pool starts to be filled - which will take about 2 weeks.

After that - we will return to site and install the above water cameras before assembling the control rack and commissioning.

Poolview Safer Swimmer Systems - bringing "Additional Essential Vision" to Lifeguards